Fine-grain control of Graph Traversal Time Limit on a per-user basis
Addresses the differing needs of project roles: Where a developer might be satisfied with bounding trace computations with the time limit so as to not interrupt task flow with long loads, a QA lead is willing to wait for as long as it takes to produce a complete traceability report.